Calendar

View all of our upcoming events.

Tap on a day to view events
« January February 2021 March »
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
31
Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Gen Run Schedule A (2:00am to 3:30am)
Gen Run Schedule A
February 3, 2021 2:00am to February 3, 2021 3:30am
  • Terminal A & Runway 17L---35R from 2:00 AM to 2:45 AM
  • Terminal A Garage & Exit Plaza from 2:45 AM to 3:30 AM
Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Gen Run Schedule B (2:00am to 3:30am)
Gen Run Schedule B
February 10, 2021 2:00am to February 10, 2021 3:30am
  • G47 Water Facility from 2:00 AM to 2:45 AM
  • ARFF Building from 2:45 AM to 3:30 AM

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Gen Run Schedule C (2:00am to 3:30am)
Gen Run Schedule C
February 17, 2021 2:00am to February 17, 2021 3:30am
  • Terminal B & APM from 2:00 AM to 2:45 AM
  • Concourse B from 2:45 AM to 3:30 AM
Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Gen Run Schedule D (2:00am to 3:30am)
Gen Run Schedule D
February 24, 2021 2:00am to February 24, 2021 3:30am
  • West Vault, Runway 17R---35L, Terminal B Parking, PSB & CW from 2:00 AM to 2:45 AM
  • RAC Substation from 2:45 AM to 3:30 AM
Terminal A Elevators Refresh
Terminal A Elevators Refresh
All Day Event

Elevators #1 & #2 in Terminal A will be out of service alternatively from January 1, 2021 to February 25, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

1
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

2
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

3
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Gen Run Schedule A (2:00am to 3:30am)
Gen Run Schedule A
March 3, 2021 2:00am to March 3, 2021 3:30am
  • Terminal A & Runway 17L---35R from 2:00 AM to 2:45 AM
  • Terminal A Garage & Exit Plaza from 2:45 AM to 3:30 AM
4
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

5
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

6
Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Posted information is for planning purposes only
For the most up to date closure information, please refer to the FAA NOTAM system or call Airside Operations at (916) 806-5309.