Calendar

View all of our upcoming events.

Tap on a day to view events
« February March 2021 April »
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
28
T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Gen Run Schedule A (2:00am to 3:30am)
Gen Run Schedule A
March 3, 2021 2:00am to March 3, 2021 3:30am
  • Terminal A & Runway 17L---35R from 2:00 AM to 2:45 AM
  • Terminal A Garage & Exit Plaza from 2:45 AM to 3:30 AM
T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

T-Mobile Ops Bldg Roof
T-Mobile Ops Bldg Roof
All Day Event

T-Mobile Operations Building will be getting a cellular upgrade. Work will be done on the roof from January 1, 2021 to March 5, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Gen Run Schedule B (2:00am to 3:30am)
Gen Run Schedule B
March 10, 2021 2:00am to March 10, 2021 3:30am
  • G47 Water Facility from 2:00 AM to 2:45 AM
  • ARFF Building from 2:45 AM to 3:30 AM

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

CLEAR Installation
CLEAR Installation
All Day Event

Terminal A & B Security Checkpoints will alternatively be under CLEAR installations from February 1, 2021 to March 12, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Gen Run Schedule C (2:00am to 3:30am)
Gen Run Schedule C
March 17, 2021 2:00am to March 17, 2021 3:30am
  • Terminal B & APM from 2:00 AM to 2:45 AM
  • Concourse B from 2:45 AM to 3:30 AM
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Terminal A Replacement Project
Terminal A Replacement Project
All Day Event

Terminal A TSA Security Checkpoint Ceiling Replacement Project will close 4 lanes from January 1, 2021 to April 1, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Gen Run Schedule D (2:00am to 3:30am)
Gen Run Schedule D
March 24, 2021 2:00am to March 24, 2021 3:30am
  • West Vault, Runway 17R---35L, Terminal B Parking, PSB & CW from 2:00 AM to 2:45 AM
  • RAC Substation from 2:45 AM to 3:30 AM
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Data Cable Trenching for New ARFF Facility (7:00am to 5:00pm)
Data Cable Trenching for New ARFF Facility
March 30, 2021 7:00am to March 30, 2021 5:00pm

Continued data cabling trenching will occur on Cy Homer (Phase 3 and 4). Contact Airside Operations for more information (916) 806-5309. 

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Data Cable Trenching for New ARFF Facility (7:00am to 5:00pm)
Data Cable Trenching for New ARFF Facility
March 31, 2021 7:00am to March 31, 2021 5:00pm

Continued data cabling trenching will occur on Cy Homer (phase 3 and 4). Contact Airside Operatoins for more details 916.806.5309.  

1
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Data Cable Trenching for New ARFF Facility (7:00am to 5:00pm)
Data Cable Trenching for New ARFF Facility
April 1, 2021 7:00am to April 1, 2021 5:00pm

Continued data cabling trenching will occur on Cy Homer (phase 3 and 4). Contact Airside Operatoins for more details 916.806.5309.  

2
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Data Cable Trenching for New ARFF Facility (7:00am to 5:00pm)
Data Cable Trenching for New ARFF Facility
April 2, 2021 7:00am to April 2, 2021 5:00pm

Continued data cabling trenching will occur on Cy Homer (phase 3 and 4). Contact Airside Operatoins for more details 916.806.5309.  

3
Installation Electric Bus Charging Stations
Installation Electric Bus Charging Stations
All Day Event

East Vault adjacent to Employee Lot 51 will be closed due to the installation of electric bus charging stations from February 1, 2021 to June 18, 2021.

Posted information is for planning purposes only
For the most up to date closure information, please refer to the FAA NOTAM system or call Airside Operations at (916) 806-5309.