North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 2, 2022 7:00am to May 2, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 3, 2022 7:00am to May 3, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Generator Load Testing: Schedule A (2:00am to 3:30am)
Generator Load Testing: Schedule A
May 4, 2022 2:00am to May 4, 2022 3:30am

Generator Run Schedule A

 

Terminal A and Runway 17L/35R

0200 – 0245

 

Terminal A Garage and Exit Plaza

0245 – 0330

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 4, 2022 7:00am to May 4, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 5, 2022 7:00am to May 5, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 6, 2022 7:00am to May 6, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 9, 2022 7:00am to May 9, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Power Cutovers (7:00am to 4:00pm)
North Campus Power Cutovers
May 9, 2022 7:00am to May 9, 2022 4:00pm

30 minute shutdown per panel in the north campus affecting the County buildings, Biffy Dump, Gate 7E, Airport Fire, Solar Farm, and Car Wash. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 10, 2022 7:00am to May 10, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Generator Load Testing: Schedule B (2:00am to 3:30am)
Generator Load Testing: Schedule B
May 11, 2022 2:00am to May 11, 2022 3:30am

Generator Run Schedule B

 

G47 Water Facility

0200 – 0245

 

ARFF

0245 – 0330

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 11, 2022 7:00am to May 11, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 12, 2022 7:00am to May 12, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 13, 2022 7:00am to May 13, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 16, 2022 7:00am to May 16, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 17, 2022 7:00am to May 17, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Generator Load Testing: Schedule C (2:00am to 3:30am)
Generator Load Testing: Schedule C
May 18, 2022 2:00am to May 18, 2022 3:30am

Generator Load Testing 2022: Schedule C

 

Terminal B and APM

0200 – 0245

 

Concourse B

0245 – 0330

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 18, 2022 7:00am to May 18, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 19, 2022 7:00am to May 19, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 20, 2022 7:00am to May 20, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 23, 2022 7:00am to May 23, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

Southwest BBQ (9:00am to 5:00pm)
Southwest BBQ
May 23, 2022 9:00am to May 23, 2022 5:00pm

Southwest BBQ on the Ramp - Near Pedestrian Gate 146

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 24, 2022 7:00am to May 24, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 25, 2022 7:00am to May 25, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 26, 2022 7:00am to May 26, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 27, 2022 7:00am to May 27, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 30, 2022 7:00am to May 30, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

North Campus Switchgear Electrical Improvements Project (7:00am to 4:00pm)
North Campus Switchgear Electrical Improvements Project
April 25, 2022 7:00am to May 31, 2022 4:00pm

Project work to complete out the North Campus Switchgear Electrical Improvements project. Contractor will be on site completing panel shutdowns and switchovers to new service, installation of bollards and generator work platforms, and removal of old equipment. 

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
May 31, 2022 7:00am to May 31, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

1
Generator Load Testing: Schedule A (2:00am to 3:30am)
Generator Load Testing: Schedule A
June 1, 2022 2:00am to June 1, 2022 3:30am

Generator Run Schedule A

 

Terminal A and Runway 17L/35R

0200 – 0245

 

Terminal A Garage and Exit Plaza

0245 – 0330

Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
June 1, 2022 7:00am to June 1, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

Airport Wide Job Fair - 6.1.22 - 10am to 3pm (10:00am to 3:00pm)
Airport Wide Job Fair - 6.1.22 - 10am to 3pm
June 1, 2022 10:00am to June 1, 2022 3:00pm

SMF is hosting an airport wide job fair in Terminal A's Media room on 6.1.22 from 10am to 3pm.

2
Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
June 2, 2022 7:00am to June 2, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

3
Replace Beacon and Ladder Project (7:00am to 4:00pm)
Replace Beacon and Ladder Project
June 3, 2022 7:00am to June 3, 2022 4:00pm

This project involves the replacement of the existing Airport Beacon just north of the new ARFF Station. 

4

Posted information is for planning purposes only
For the most up to date closure information, please refer to the FAA NOTAM system or call Airside Operations at (916) 806-5309.