North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

29
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

30
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

Gen Run Schedule A (2:00am to 3:30am)
Gen Run Schedule A
July 7, 2021 2:00am to July 7, 2021 3:30am
  • Terminal A & Runway 17L---35R from 2:00 AM to 2:45 AM
  • Terminal A Garage & Exit Plaza from 2:45 AM to 3:30 AM
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

SMF Electric Bus Chargers - North Maintenance Area
SMF Electric Bus Chargers - North Maintenance Area
All Day Event

Installation of Bus Charging Station at the North Maintenance Area. Work hours are 7 A.M. to 5 P.M.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

Gen Run Schedule B (2:00am to 3:30am)
Gen Run Schedule B
July 14, 2021 2:00am to July 14, 2021 3:30am
  • G47 Water Facility from 2:00 AM to 2:45 AM
  • ARFF Building from 2:45 AM to 3:30 AM

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

Gen Run Schedule C (2:00am to 3:30am)
Gen Run Schedule C
July 21, 2021 2:00am to July 21, 2021 3:30am
  • Terminal B & APM from 2:00 AM to 2:45 AM
  • Concourse B from 2:45 AM to 3:30 AM
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

Gen Run Schedule D (2:00am to 3:30am)
Gen Run Schedule D
July 28, 2021 2:00am to July 28, 2021 3:30am
  • West Vault, Runway 17R---35L, Terminal B Parking, PSB & CW from 2:00 AM to 2:45 AM
  • RAC Substation from 2:45 AM to 3:30 AM
North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

North Campus Switchgear Project
North Campus Switchgear Project
All Day Event

This project includes the design and construction of infrastructure improvements and replacement of switchgear equipment for the North Airfield campus at Sacramento International Airport.

ARFF Facility Project
ARFF Facility Project
All Day Event

Construction of a new facility for Sacramento County Airport Fire operations at SMF in the North Airfield area.  The facility will include office space, equipment bays, and living quarters.

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

RON Apron Project
RON Apron Project
All Day Event

The purpose of this project is design and construct a Remain Overnight (RON) parking apron to the east of Terminal A. This project is needed to provide an additional overnight aircraft staging area to meet current and forecast demand.

NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
NOTAM 11/016 TWY TWY C2, C1, Y1, Y Closures
All Day Event

!SMF 11/016 SMF TWY C2, TWY C1 BTN TWY Y1 AND TWY D, TWY Y1 BTN TWY C1 AND TWY W, TWY Y BTN TWY Y2 AND TWY Y1 CLSD 2111091621-2112170001 / Closure for RON Apron Project

Posted information is for planning purposes only
For the most up to date closure information, please refer to the FAA NOTAM system or call Airside Operations at (916) 806-5309.